Friday, January 25, 2013

Inside Action

Activity on the interior of the new church yesterday:
 Scissor lift in front of choir loft
 Right transept work
Stained glass window openings

Monday, January 21, 2013

Looking into a shrine

Look straight ahead in this photo and you will see the framed shrine area with two smaller arched windows above.  The church will have four shrine areas framing the transepts and nave.  The transepts are the side wings and the nave is the main body of the church.

Friday, January 11, 2013

Recent Interior Shot

While the exterior may look fairly calm....
There is a lot of interior work underway!  This shot is taken from the entrance to the sanctuary.  Note the steel arches and the cupola in the ceiling.

Thursday, January 3, 2013

Dressed for the New Year!


Sister Hannah took this picture during the last weekend of December.